Mr. E. C. Fernando, Chief Engineer of The Department of Electrical Undertakings, Was Present at The Ceremony
326-IM-2690-0047
Even The Water Level at The Tributarfes That Led to The Mousakelle Reservoir has Dropped to the Lowest Level
326-IM-2690-0046
President J.R. Jayawardana, Minister Gamini Dissanayake, Education Minister Ranil Wickramasinghe, Vice Minister P. Dayarathna And Dr. K. K. Y. W. Perera
326-IM-2690-0041
Mr. C. P. de Silva, Minister of Agriculture, Lands, Irrigation And Power, Inaugurated the Gal Oya-Laxapana Power Link at Gal Oya
326-IM-2690-0040
BICC Overhead Double Circuit Transmission Lines Carried on a Single Member P.U. Pole With a Reinforced Concrete Strut in The Galle Area of Southern Ceylon
326-IM-2690-0039
The New Thermal Power Station at Grandpass, Colombo is Almost Complete and will be Opened Shortly
326-IM-2690-0038
Maskeliya Oya Power Project.Laxapana and Samanala Dams,Power Plants and Dams - Local and Foreign.
326-IM-2690-0037
Maskeliya Oya Power Project.Laxapana and Samanala Dams,Power Plants and Dams - Local and Foreign.
326-IM-2690-0032
Maskeliya Oya Power Project.Laxapana and Samanala Dams,Power Plants and Dams - Local and Foreign.
326-IM-2690-0030
This Serious Group of Students, Many of Whom Are Successful Businessmen During The Day, Are Studying Electronics in Their Spare Evening Hours
326-IM-2690-0029
Maskeliya Oya Power Project.Laxapana and Samanala Dams,Power Plants and Dams - Local and Foreign.
326-IM-2690-0028
BICC 11KV Cables Being Laid on The Outskirts of Colombo for The Department of Electrical Undertakings of Ceylon for The Northern Ring Reinforcement Scheme
326-IM-2690-0026
The Ten Panel Svitchboard Above is Part of the Equpment for the Power Station of The Minneriya Hydro Thermal Power Project Presently Being Undertaken by The Irrigation Department
326-IM-2690-0023
The Robert Moses Niagara Power Plant the Largest Ever Constructed, Has 13 Generators With a Total Installed Capacity of 1950000 Kilowotts
326-IM-2690-0020