- 0073
- Item
- 1966-2-14
Pictured: View of the Kariba dam power house units, situation on the border of Rhodesia and Zambia. Smith had threatened several times during the last month of his regime to dynamite the dam.
ADN-ZB
3 results with digital objects Show results with digital objects
Pictured: View of the Kariba dam power house units, situation on the border of Rhodesia and Zambia. Smith had threatened several times during the last month of his regime to dynamite the dam.
ADN-ZB
ZAPU Helps Refugees from Zimbabwe
Several thousands of young women and girls from Zimbabwe live in the "Victoria Camp" a refugee camp in Zambia kept by ZAPU, part of the Patriotic Front. The refugees escaped from the Smith-terror to Zambia or saved themselves from the Muzorewa-Smi...
ADN-ZB
Situated where Kariba gorge begins, Kariba fill dam had been built from 1956 to 1961. The half-round fill dam which banks up Zambezi river is 128 meters high and 617 meters long at the top. The concrete dam makes Zambezi river a 281-kilometre-long...
ADN-ZB